Comprehensive measures have been carried out and implemented to ensure that our facility meets the highest safety standards against earthquakes and fires.

• Starting in 2023, our entire facility underwent seismic reinforcement work, and the building we operate in has been made compliant with the Controlled Damage Performance Level requirements defined in the 2019 Turkish Earthquake Code.

• As part of the reinforcement activities, necessary improvements have been made to address potential fire risks, and adequate measures have been implemented to handle initial fires. The Fire Safety Compliance Report from the İzmir Metropolitan Municipality Fire Department, dated May 15, 2024, has been obtained.

Go To Top